Repar Runway 14/32, National Guard Bureau (NGB), Buckley AFB, CO

Complete full depth repair of 1,700’ of PCC on south runway, 3,850’ of PCC on north runway, 1,000’ of north overrun, 650,000sf main ramp PCC, construct sub-base, base course, drainage, relocated utilities, runway shoulders, taxiway transition lead-in’s, adjusted longitudinal grades as required, edge drainage along runway, taxiway’s & main ramp, runway & taxiway edge lights and circuits, north approach threshold  light bar, airfield lighting circuits replaced new, Type H retractable hook cable system, BAK-12 aircraft arresting systems replaced with permanent surface type, and replaced  airfield navigation signage new.